Posted by Steve Fitzsimons on Monday, September 9, 2013,
It's been a long and busy construction season! Most aspects of the job have gone smoothly but there have been a couple hangups. The biggest so far is the poles used to support the overhead "Meter On" signs. Not installed often, the normally highly reliable vendor failed their on-site inspections twice and delivered the poles much later than anticipated. Then another exceptionally long delay with one small component, the U-bolts that hold the signs to the poles. The other constant headach...